Customers’ References

  • During the construction of a repair depot for Sapsan trains, the main difficulties were the space-limited environment, tight time frames and parallel work with the Customer's direct contractors. When solving these problems, STEP constantly and intensively interacted with the Customer. 

    Due to the fact that the work was carried out on the territory of the operating depot, it was necessary to coordinate the work process with the structural divisions of Russian Railways, that was done in full and within the established deadlines. Therefore, we can say with confidence that STEP is a team of professionals operating in accordance with Russian and international standards. 

  • During the construction of the drive technology center, the company performed a full range of construction and installation, finishing and engineering works. The company also provided the ability to install technological equipment in rooms with strict cleanliness requirements. All work was carried out at a high professional level with the use of modern, high-quality, environmentally friendly building materials and equipment. 

    Finishing works and landscaping were carried out in accordance with European standards and the Sew-Eurodrive’s requirements. The constructed facility is equipped with modern engineering systems and fitted out with automation and dispatching systems of a high level, with the ability to control systems from one workplace.

  • LUKOIL-Severo-Zapadneftprodukt expresses its gratitude to STEP for the high-quality and prompt work on the construction of a new LUKOIL office center - an A-class business center. Made in the traditional for the Northern capital "palace style", the building harmoniously complements the overall architectural appearance of the city, at the same time being a modern high-tech complex.

    During the construction period, STEP has proved to be a reliable and competent partner capable of efficient implementation of a complex project in a short time, using innovative technologies and offering optimal solutions.

  • STEP performed design and survey work, development of permission documentation, general contracting work for the construction of a pharmaceutical production complex.

    The main difficulty was in performing work in conditions of changes in technical solutions: the ability of the General Contractor to respond quickly and effectively, to make changes to the project were important. It was also important to carry out construction and installation work in parallel with the installation of technological equipment. When solving these issues, STEP company constantly and intensively interacted with the Customer, that made it possible to complete this facility and successfully perform all tasks. 

  • The Cement Briquetting Plant is situated close to the existing factory buildings and the project required close liaison with the factory particularly in respect to the many engineering networks in the area.

    Contractor had to allow the erection of process equipment inside the building during construction, which combined with the usual winter conditions meant very close co-ordination and co-operation with the German equipment supplier.

    During the construction period, STEP carried out several additional works in connection with the plant which substantially increased the overall Contract Value.

  • STEP acted as a General Contractor for the construction of the Hitachi machine-building plant. We would like to note that all work was performed with proper quality, as well as with observance of all labor protection and safety standards and in full compliance with construction standards and regulations.

    STEP’s specialists are always open for constructive and effective interaction, targeted on a common result. I would like to note the involvement in the project and the open position in relation to the Customer, the ability to find compromise solutions in difficult situations.

  • During the construction of a complex for the production of cryogenic equipment, STEP demonstrated its professional level of work performance. STEP collaborated closely with the Customer, that contributed to the timely solution of emerging issues and, ultimately, made it possible to successfully complete the assigned tasks.

    Construction standards, health and safety regulations were followed. We highly appreciated the dedication and responsiveness of the project team.

  • During the construction of the tailings treatment complex of the Karelsky Okatysh MPP, STEP performed the installation of bored piles, fabrication and installation of the supporting metal structures of the complex, as well as assembly and installation of equipment for two OUTOTEC thickeners with a diameter of 36.5 meters.
    During the implementation of the project, STEP has proved to be a reliable partner, ready to find a way to accommodate Customer’s requests and promptly respond to emerging technological and management difficulties. All work was carried out within the previously approved budget

  • STEP acted as a General Contractor in the implementation of the project “Technical re-equipment of the oxygen station and the construction of a tank farm for air separation products on the territory of Logika, ZAO.
    The complexity of the project was determined by its implementation on the territory of an operating enterprise. Throughout the project, the STEP team has always been open to constructive partnerships and is always ready to provide assistance, even beyond the scope of the concluded Contract.
    We especially note the high level of work organization and project management as a whole, as well as engineering competence, professional approach and efficiency in solving problems

  • During the construction of the concentrate shipment unit as part of the concentration plant at the site of Kola MMC located in Zapolyarny, the company carried out a full range of construction and installation and commissioning works, as well as transfer of the facility to the plant's operation services. 

    The work was carried out on a tight schedule and in conditions of remoteness of the construction site from the locations of material and human resources. In the course of work at the facility, the company showed a high professional level, competent management of the project construction, and correct organization of work. Performing this project, STEP has confirmed its reputation as a competent and professional contractor.