RostarAluminum can manufacturing plant

Delivery period for this project was very short, in fact it took only 15 months to complete. STEP carried out the entire scope of design and planning works, executed production plant construction phase, renovated storage facilities, and performed landscaping on adjacent territory. Company installed all utility systems, constructed access roads to existing warehouses and production facilities from three different sides. The project was carried out jointly with American engineering company Roeslein & Associates, and equipment suppliers from USA (Sequa Can Machinery and Belvac Production Machinery) and Germany (ITS GmbH, NSM Magnettechnik GmbH & Co).
Industry sector
Industrial construction
Location
Leningradskaya Oblast, Vsevolozhsk
Customer
ROSTAR LLC
Project duration
31.08.2002 – 17.09.2003
Contract type
General contract on construction, General contract on design and engineering