Air Liquide № 11Air separation unit. Oxygen station.

STEP built an air separation unit supplying Cherepovets Metallurgical Plant with high purity, high-pressure oxygen, as well as nitrogen and argon gases. Within the scope of this project, STEP was responsible for equipment installation, commissioning and start-up. At that time, this air separation unit was the largest one of its kind in Europe. At some later stage, STEP had installed an additional unit for krypton and xenon inert gases production located within air separation unit No. 11.
Industry sector
Industrial construction
Location
Cherepovets, st. Ustyuzhenskaya, 97
Customer
Air Liquide Severstal LLC
Project duration
01.12.2005 – 19.09.2008
Contract type
General contract on construction
Testimonials
Air Liquide Severstal