Air Liquide Lilo Oxygen station technical upgrading

Within the scope of this project, STEP carried out oxygen station upgrading by installing modern equipment, designed by Air Liquide's own design team. STEP has also built a reserve for air separation byproducts. The company successfully dealt with a challenging task, replacing station’s equipment without shutting down the production.
Industry sector
Industrial construction
Location
Moscow Region, Zelenograd
Customer
Logika LLC – Air Liquide subsidiary
Project duration
01.08.2014 – 31.07.2015
Contract type
General contract on construction
Testimonials
Air Liquide