Vostokgeologiya LLC (Norilsk Nickel), Zabaikalsky Krai

  • Customer

    Vostokgeologiya LLC (Norilsk Nickel)

  • PROJECT DURATION

    01.07.2016 -25.11.2017

  • Status

    Сдан

  • CONTRACT TYPE

    EPC-contract

  • LOCATION

    Zabaikalsky Krai, Gazimuro-Zavodskoy District

  • SCOPE OF THE WORKS

    <p> Within the contract terms the following works were completed: </p> <p> </p> <ul> <li> Basic engineering;</li> <li> </li> <li>Сonstruction design stage;</li> <li> </li> <li>Сonstruction detail design stage;</li> <li> </li> <li>Construction and installation works;</li> <li> </li> <li>Supply of process equipment;</li> <li> </li> <li>Commissioning of process equipment;</li> <li> </li> <li>Commissioning of general engineering equipment;</li> <li> </li> <li> Report on the conformity. <p> </p> </li> </ul>

  • Vostokgeologiya LLC (Norilsk Nickel), Zabaikalsky Krai

Project

Within the scope of the signed EPC contract, STEP constructed a new drying station for magnetite concentrate to be added to Bystrinsky Mining and Processing Plant. The contract was executed on a turnkey basis.

In addition to construction works, the contract included development of all engineering and technical documentation, supply and installation of equipment, commissioning and start-up services. To the date, this is the largest project in the Company's history and one of the most challenging because of its considerable distance from the nearest city (Chita). Commemorating the quality of the work performed at this project, STEP received a nameplate "For a significant contribution to the construction of Bystrinsky MPP."